Alex Fraser Bridge

During this 4-month project, CanWest completed all the concrete cutting and removal required to add a seventh lane and a new counterflow, moveable barrier system to the Alex Fraser Bridge.

The project included:

  • Cutting and removing the centre barrier using a custom wire saw mount fabricated to fit a skid steer.
  • Night work during winter months, and coordinated efforts with the general contractor and Delta Police Department concerning traffic control and lane closures.
  • 5 kilometers of 2-inch wide slab sawing from end to end of the bridge, 2.4 kilometers of wire sawing, and 2.4 kilometers of barrier removal by crane.
  • A slabsaw cut notch required on either side of barrier to supply the belowgrade elevation. Slabsaw vertical cuts were needed through a 20 inch thick barrier, cut into 16 foot lengths.
  • Setting up a straddle mounted wire saw on top of the barrier. The barrier was cut horizontally to required below-grade depth. The project had very tight tolerances.
  • Removing the barrier with a crane truck, and disposal of concrete.
  • Roughening the cut area to prepare the surface for new topping.
Alex Fraser Bridge

Interested in Working With Us?

Letโ€™s start the conversation regarding your project. Our knowledgeable and experienced project managers are standing by to discuss timelines, costs and details. Give us a call or fill out a form and we will get back to you within 1 business day.
(604) 270-0303
linkedin facebook pinterest youtube rss twitter instagram facebook-blank rss-blank linkedin-blank pinterest youtube twitter instagram